Marking Out
The first job we do in pool construction is marking out the excavation. For this particular pool we were asked to provide a pool big enough for exercise in a confined space. We opted for a 10 metre length by 4 metres wide so as to give the owner a big enough pool for swimming lengths whilst still providing a good sized terrace for relaxation.
Excavation
We had very limited access for this build, a normal driveway. We excavated 75 cubic metres of material in total for this build. Due to the restricted access much of the waste material was lifted out over the villa for disposal. It is essential to have an experienced excavation company for this type of dig. The result, hole dug and no damage to the property.
Hitting Rock
Quite often on the excavation we hit rock. On this build we had to bring the hydraulic chisel for the final metre so we could achieve the right depth for the pool.
Excavation finished
Now the hole is finished and ready for construction.
Building the outside wall
Next we build the outside wall giving the basic shape of the finished pool.
Follow us next week for the next stage of Construction…………..